16 |
Suspension of Business Dealings with M/s DEFSYS Solutions Pvt. Ltd. |
09-07-2024 |
Download (856.53 KB)
|
17 |
Details of firms debarred/put on hold/suspended etc. from doing business with MoD-reg. |
08-07-2024 |
Download (696.28 KB)
|
18 |
Calendar for Sittings of the First Session of the 18th Lok Sabha and 264th Session of the Rajya Sabha. |
18-06-2024 |
Download (478.23 KB)
|
19 |
Extension of suspension of business dealings with M/s Vectra Advanced Engineering Pvt. Ltd (VAEPL) (now M/s VERT Equipment Private Limited) for a period of six months w.e.f. 14.02.2024 |
11-03-2024 |
Download (315.73 KB)
|